https://centraljetcharter.com/bbj-max.html
On July 23, 2013, Boeing completed the firm configuration for the 737 MAX 8. In December 2013, Boeing stated that a recent internal audit forecasts a 14% lower fuel burn than current 737NG series aircraft.
In September 2014, Boeing launched a high density version of the 737 MAX 8, named the 737 MAX 200. The MAX 200 is named for its seating for up to 200 passengers in a single-class high-density configuration with slimline seats.
An extra exit door is required because of the higher passenger capacity. Three of eight galley trolleys are removed to accommodate more passenger space..
Boeing states that this version will be 20% more cost efficient per seat than current 737 models, and will be the most efficient narrow body on the market when delivered, including 5% lower operating costs than the 737 MAX 8
Boeing has increased 737 production to 42 per month in 2014, and plans to increase rates to 47 per month in 2017 and 52 per month in 2018.
"Boeing Business Jet,
On July 23, 2013, Boeing completed the firm configuration for the 737 MAX 8. In December 2013, Boeing stated that a recent internal audit forecasts a 14% lower fuel burn than current 737NG series aircraft.
In September 2014, Boeing launched a high density version of the 737 MAX 8, named the 737 MAX 200. The MAX 200 is named for its seating for up to 200 passengers in a single-class high-density configuration with slimline seats.
An extra exit door is required because of the higher passenger capacity. Three of eight galley trolleys are removed to accommodate more passenger space..
Boeing states that this version will be 20% more cost efficient per seat than current 737 models, and will be the most efficient narrow body on the market when delivered, including 5% lower operating costs than the 737 MAX 8
Boeing has increased 737 production to 42 per month in 2014, and plans to increase rates to 47 per month in 2017 and 52 per month in 2018.
"Boeing Business Jet,
Comments
Post a Comment